Pedestrian Routes to Schools/Green Infrastructure Project

Project Type:
Street
Project Status: 
Completed

Pedestrian safety improvements include new curb ramps, re-striped intersections and signage, and insetting wayfinding markers denoting the Walk Routes to Schools.  Green infrastructure bio-retention basins, or bioswales, are located at three different intersections along the Walk Routes - Visitacion & Mariposa, Visitacion & Alvarado, and San Bruno & Santa Clara.  These bioswales are filled with a myriad of drought-tolerant plants, and they capture and treat stormwater before it enters the San Francisco Bay.  

This project is designed to enhance walking conditions for students walking to school and for pedestrians of all ages, as well as improve stormwater quality and reduce pollutant loads in the Bay.  See a video that was produced in 2020 when the project wrapped up.

snip from Blast edited
Southeast basin at Visitacion and Mariposa
Map of Green Infrastructure Features
Project Locations
Visitacion and Alvarado
Visitacion and Alvarado
Solano and Humboldt
Southeast basin at Visitacion and Mariposa
Bioretention basin on Santa Clara and San Bruno
Bioretention basis on Mariposa and Visitacion
Walk Route Wayfinding Marker
Bioretention Basin at Visitacion and Alvarado
Bioretention basin at Visitacion and Alvarado
Island at Visitacion and Alvardo
New curb ramps and bricks on Visitacion
Safe Routes to Schools Map